{"id":7210,"date":"2018-10-10T12:49:00","date_gmt":"2018-10-10T12:49:00","guid":{"rendered":"https:\/\/new.gruber-logistics.dev\/2018\/10\/10\/brenner-base-tunnel-2\/"},"modified":"2018-10-10T12:49:00","modified_gmt":"2018-10-10T12:49:00","slug":"brenner-base-tunnel-2","status":"publish","type":"post","link":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/","title":{"rendered":"GRUBER Logistics manages abnormal loads for the Brenner Base Tunnel"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">South Tyrolean company Gruber Logistics has secured a major contract within the construction project for the Brenner Base Tunnel, set to connect Austria and Italy and become the longest undergroun<sup><\/sup>d railway connection in the world.<sup><\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Together with other project partners, Gruber Logistics&#8217; &#8220;Abnormal Loads&#8221; division handled both the transport of three &#8220;TBM&#8221; tunnel boring machines to be used for excavating the exploratory tunnel and the main railway tubes, a<sup><\/sup>nd the handling of the components required to assemble the machines inside the tunnel.<sup><\/sup><sup><\/sup><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The mach<sup><\/sup>ines were tested during the winter at the manufacturer&#8217;s facility in German<sup><\/sup>y and subsequently dismantled and prepared for transport.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first of the three machines, which will excavate the exploratory tunnel, has already been assembled and is currently located at the Mules construction site in South Tyrol.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here, the tunnel is being excavated up to the state border, where it will connect to the section built in Austria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The machine measures an impressive 80 m in length and requires a team of 15 people working 24 hours a day, 7 days a week.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>South Tyrolean company Gruber Logistics has secured a major contract within the construction project for the Brenner Base Tunnel, set to connect Austria and Italy and become the longest underground railway connection in the world. Together with other project partners, Gruber Logistics&#8217; &#8220;Abnormal Loads&#8221; division handled both the transport of three &#8220;TBM&#8221; tunnel boring machines [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3357,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[42],"tags":[],"class_list":["post-7210","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":{"image-2":3358,"image-2_copy":null,"titolo_paragrafo_1":"","titolo_paragrafo_2":"","image-3":"","testo-2":"<p data-path-to-node=\"6\">\"The transport phase of the tunnel boring machine components was particularly complex,\" states Mr. Michael Gruber, Head of the Abnormal Loads Division. \"Due to their massive weight and dimensions, they required the joint effort of several branches and departments across the Gruber Group.\"<\/p>\r\n<p data-path-to-node=\"7\"><span class=\"citation-596 citation-597 citation-end-597\">In fact, this involved around 160 transports per machine, for a total of 2,887 tonnes transported.<\/span><\/p>\r\n<p data-path-to-node=\"8\"><span class=\"citation-594 citation-595 citation-end-595\">Their transport therefore required a dedicated study: the less challenging components were delivered via the Brenner Pass or through Switzerland.<\/span><\/p>\r\n<p data-path-to-node=\"9\"><span class=\"citation-592 citation-593 citation-end-593\">For the heaviest ones, given the wei<\/span><span class=\"citation-592 citation-end-592\">ght and dimension restrictions on German road networks leading to the site, the transport had to be split into several<\/span> stages, requiring the collaboration of our Bremen branch specialised in sea freight: a first leg by river <span class=\"citation-588 citation-589 citation-590 citation-591 citation-end-591\">from Kehl to Antwerp, a second by sea to Marghera, before finally reaching the Mules site by road, using heavy haulage trucks.<\/span><\/p>\r\n<p data-path-to-node=\"10\"><span class=\"citation-584 citation-585 citation-586 citation-587 citation-end-587\">The heaviest components of this transport were the two main drives of the TBMs, <\/span><span class=\"citation-584 citation-585 citation-586 citation-end-586\">measuring 7090x6850x2600 mm and weighing 146<\/span><span class=\"citation-584 citation-585 citation-end-585\"> tonnes each.<\/span><\/p>\r\n\r\n<div class=\"source-inline-chip-container luminous-sources ng-star-inserted\"><\/div>\r\n<p data-path-to-node=\"11\"><span class=\"citation-582 citation-583 citation-end-583\">Once delivered, the TBMs will be reassembled in ded<\/span><span class=\"citation-582 citation-end-582\">icated assembly chambers inside the tunn<\/span>el.<\/p>\r\n\r\n<div class=\"source-inline-chip-container luminous-sources ng-star-inserted\"><\/div>","video":null},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>GRUBER Logistics for the Brenner Base Tunnel - GRUBER Logistics<\/title>\n<meta name=\"description\" content=\"GRUBER Logistics has secured a major contract in the Brenner Base Tunnel construction project connecting Austria and Italy.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GRUBER Logistics for the Brenner Base Tunnel - GRUBER Logistics\" \/>\n<meta property=\"og:description\" content=\"GRUBER Logistics has secured a major contract in the Brenner Base Tunnel construction project connecting Austria and Italy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/\" \/>\n<meta property=\"og:site_name\" content=\"GRUBER Logistics\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-10T12:49:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1618\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Alma Digital\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alma Digital\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/\"},\"author\":{\"name\":\"Alma Digital\",\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/#\/schema\/person\/bac40b2449bc25dc0b5ed631cd6513a6\"},\"headline\":\"GRUBER Logistics manages abnormal loads for the Brenner Base Tunnel\",\"datePublished\":\"2018-10-10T12:49:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/\"},\"wordCount\":187,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/\",\"url\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/\",\"name\":\"GRUBER Logistics for the Brenner Base Tunnel - GRUBER Logistics\",\"isPartOf\":{\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp\",\"datePublished\":\"2018-10-10T12:49:00+00:00\",\"author\":{\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/#\/schema\/person\/bac40b2449bc25dc0b5ed631cd6513a6\"},\"description\":\"GRUBER Logistics has secured a major contract in the Brenner Base Tunnel construction project connecting Austria and Italy.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#primaryimage\",\"url\":\"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp\",\"contentUrl\":\"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp\",\"width\":1618,\"height\":1080,\"caption\":\"tunnel del brennero\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.gruber-logistics.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"GRUBER Logistics manages abnormal loads for the Brenner Base Tunnel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/#website\",\"url\":\"https:\/\/www.gruber-logistics.com\/en\/\",\"name\":\"GRUBER Logistics\",\"description\":\"Innovating transport &amp; logistics since 1936\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.gruber-logistics.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/#\/schema\/person\/bac40b2449bc25dc0b5ed631cd6513a6\",\"name\":\"Alma Digital\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.gruber-logistics.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d70dca297976168d01d6120346c927cfafafbf214e0a8120055189a9892c1066?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d70dca297976168d01d6120346c927cfafafbf214e0a8120055189a9892c1066?s=96&d=mm&r=g\",\"caption\":\"Alma Digital\"},\"url\":\"https:\/\/www.gruber-logistics.com\/en\/author\/alma-digital\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"GRUBER Logistics for the Brenner Base Tunnel - GRUBER Logistics","description":"GRUBER Logistics has secured a major contract in the Brenner Base Tunnel construction project connecting Austria and Italy.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"GRUBER Logistics for the Brenner Base Tunnel - GRUBER Logistics","og_description":"GRUBER Logistics has secured a major contract in the Brenner Base Tunnel construction project connecting Austria and Italy.","og_url":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/","og_site_name":"GRUBER Logistics","article_published_time":"2018-10-10T12:49:00+00:00","og_image":[{"width":1618,"height":1080,"url":"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp","type":"image\/webp"}],"author":"Alma Digital","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Alma Digital","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#article","isPartOf":{"@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/"},"author":{"name":"Alma Digital","@id":"https:\/\/www.gruber-logistics.com\/en\/#\/schema\/person\/bac40b2449bc25dc0b5ed631cd6513a6"},"headline":"GRUBER Logistics manages abnormal loads for the Brenner Base Tunnel","datePublished":"2018-10-10T12:49:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/"},"wordCount":187,"commentCount":0,"image":{"@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp","articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/","url":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/","name":"GRUBER Logistics for the Brenner Base Tunnel - GRUBER Logistics","isPartOf":{"@id":"https:\/\/www.gruber-logistics.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#primaryimage"},"image":{"@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp","datePublished":"2018-10-10T12:49:00+00:00","author":{"@id":"https:\/\/www.gruber-logistics.com\/en\/#\/schema\/person\/bac40b2449bc25dc0b5ed631cd6513a6"},"description":"GRUBER Logistics has secured a major contract in the Brenner Base Tunnel construction project connecting Austria and Italy.","breadcrumb":{"@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#primaryimage","url":"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp","contentUrl":"https:\/\/www.gruber-logistics.com\/wp-content\/uploads\/2026\/07\/BBT-Mules-4989.webp","width":1618,"height":1080,"caption":"tunnel del brennero"},{"@type":"BreadcrumbList","@id":"https:\/\/www.gruber-logistics.com\/en\/2018\/10\/10\/brenner-base-tunnel-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.gruber-logistics.com\/en\/"},{"@type":"ListItem","position":2,"name":"GRUBER Logistics manages abnormal loads for the Brenner Base Tunnel"}]},{"@type":"WebSite","@id":"https:\/\/www.gruber-logistics.com\/en\/#website","url":"https:\/\/www.gruber-logistics.com\/en\/","name":"GRUBER Logistics","description":"Innovating transport &amp; logistics since 1936","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.gruber-logistics.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.gruber-logistics.com\/en\/#\/schema\/person\/bac40b2449bc25dc0b5ed631cd6513a6","name":"Alma Digital","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.gruber-logistics.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d70dca297976168d01d6120346c927cfafafbf214e0a8120055189a9892c1066?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d70dca297976168d01d6120346c927cfafafbf214e0a8120055189a9892c1066?s=96&d=mm&r=g","caption":"Alma Digital"},"url":"https:\/\/www.gruber-logistics.com\/en\/author\/alma-digital\/"}]}},"_links":{"self":[{"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/posts\/7210","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/comments?post=7210"}],"version-history":[{"count":0,"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/posts\/7210\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/media\/3357"}],"wp:attachment":[{"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/media?parent=7210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/categories?post=7210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gruber-logistics.com\/en\/wp-json\/wp\/v2\/tags?post=7210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}